Saturday, January 31, 2009

Windows and Doors

Happy Erin at the front door - just basic for now - no hardware, no paint, no peephole... but its a door and Erin is quite happy. 

Back windows and sliding glass door to the patio:

Kitchen ventilation and recessed can lights:


Ceiling fan hookups:


Full view of the front:


Thursday, January 29, 2009

Roof done - and more!

All the shingles on:


A/C roughed in duct work inside:

The shower/tubs are in the bathrooms and the plumbing is in:

This is so they don't forget what to call that area above the ceiling but below the roof... you know... starts with an "A" or something...


And a side view of the house from the road for another angle of the pretty roof shingles:


Tuesday, January 27, 2009

OK, people - that's a wrap!

It was extremely foggy this afternoon, so visibility wasn't all that great, but the house is now wrapped and the shingles have been started.

You can just make out the lighter shaded shingles in the below shot on the right hand side of the roof - they will be more tan in regular daylight (they look a little dark in the deep fog).



And the little strips of siding around the very edge of the roof are on as well.


And our future neighbors now have a slab poured, so they are only a week or two behind us in construction - should mean no construction noise for us once we move in. :)

Saturday, January 24, 2009

Getting ready to roof

According to one of the roofing subcontractors we ran into today the roof should be finished by Tuesday night.


Erin peeking out of what will be the coat closet by the front door.

Alan at the kitchen sink again, now with a wall for reference.

Rafters...

Looking out from the front door over the porch area.


Monday, January 19, 2009

Slab happy

View from the road:


Erin standing at the front door:

Alan at the kitchen sink - possibly for the last time Erin says:


No longer needed wood from the framing:


View from inside the kitchen towards the road:

Wednesday, January 14, 2009

Pipes are down

Front of the house looking straight down past the laundry room, main sewer line, and kitchen in the back.

The kitchen from the side - sink on the left, water for the fridge/ice maker on the right:

Protective pipe for the air conditioner wiring and such, running underneath the master bedroom area:


Cluster for the master bath and second bath on the right:

Street view:

Monday, January 12, 2009

Sunday, January 4, 2009

Cleared Lot

Permitting is almost complete - should get a call this week from the construction supervisor for our pre-construction meeting - ground should be broken in less than a week or two.



And we have a Doc Box: